CGWA/RGI-accredited Ground Water Professional · Led by former CGWB Chairmen · RGI-certified Water Auditor +91 98110 25130 · info@hydrogeosolutions.in
Hydro Geo Solutions LLP Innovate, Conserve, Sustain
Home / NOC checker
Free tool · 1 minute

1-minute NOC check: which study does your project need?

Answer five questions about your project. You will see which report your NOC needs, and whether a groundwater model is required. Want the full rules, what to do after the NOC, and penalties? Read the NOC guide.

The form opens with example answers so you can see a result. Change them to match your site.

The rule behind the tool

Criteria for groundwater modelling

Para 8, amendment to the CGWA guidelines notified on 29.03.2023. Projects above these limits must submit an Impact Assessment Report and a groundwater modelling study covering a 5 km radius around the site, prepared by an accredited consultant.

ProjectAssessment unitArea typeWithdrawal (m³/day)Modelling
IndustryOver-exploited, critical, semi-criticalHard rock / non-alluvium>100 to 500Analytical (SOP Section F)
Alluvium>100 to 1,000Analytical (SOP Section F)
Hard rock / non-alluvium>500Numerical
Alluvium>1,000Numerical
SafeHard rock / non-alluvium>500Numerical
Alluvium>2,000Numerical
MiningAllAllSeepage >500Numerical
InfrastructureAllAllAny dewateringNumerical, irrespective of quantum

Have a water question at your site?

Tell us about your site and what you need to know. A senior hydrogeologist replies within one working day.

WhatsApp